|
|
|
|
|
Lift equipped with all necessary tools;
|
|
|
|
Bottom hole equipment
|
|
|
|
Tubing (quantity according to well depth);
|
|
|
|
Two pumping units with plungers;
|
|
|
|
Water Pump with Tank and shale shaker
|
|
|
|
Water Tanks (3 times volume of the well)
|
|
|
|
Preventer;
|
|
|
|
Sand blender unit;
|
|
|
|
Collar locator and pup joints;
|
|
|
|
Sand Blender (Sand King) with transporter;
|
|
|
|
Gamma Ray;
|
|
|
|
Packer;
|
|
|
|