| Name of Well, number |
|
| Final drilling date/ setting into operation |
|
| Well design |
|
| |
Drilled bottom, ft |
|
| |
Artificial bottom, ft |
|
| |
Casing: Outside diameter (OD) and Inside diameter (ID), inch |
|
| |
Casing point (csg pt), ft |
|
| |
Correcteol total depth (CTD), ft |
|
| |
Perforation zone, ft |
|
| |
Maximum angles of wells curvature, grad |
|
| Well fluid |
|
| |
Density of oil |
|
| |
Coefficient kinematics Viscosity of oil (mg), Pa x s |
|
| |
Water cutting of Well Production, % |
|
| |
Paraffin content, % weight |
|
| |
Resin and asphaltene content, % weight |
|
| |
GOR (gas-oil ratio) |
|
| Distance to the nearest water-bearing horizon, oil-water contact,
ft |
|
| Production rate (initial, maximum, current in accordance with
time factor), bbl/d |
|
| Productivity factor (index) |
|
| Curve pressure build-up |
|
| Indicator diagram |
|
| Skin effect |
|
| Distance to the next Wells or Drainage Radius, ft |
|
| Previously executed work on well work-over and stimulation |
|
|
|